Changes to Step #2
Step Lines
+ | [* black] Identify and remove large capacitors (diameter > 2 cm) and store in a separate secure container. |
---|---|
+ | [* black] Continue with the instructions on [DS 26: Capacitor]. |
+ | [* black] Also screen the PWB for mercury switches and remove existing switches. Store them in a separate secure container. |