[title] Removal of Printed Circuit Boards (PCB)
-[* black] Remove cables: Loosen all fifteen connectors (highlighted in red boxes) and tripped off the tapes used to fix cables to the metal-casing.
+[* black] Remove cables: Disconnect all fifteen connectors (highlighted in red boxes) and separate the tapes used to fix cables to the metal-casing.
[* black] Remove Printed Circuit Boards (PCBs):
- [* black] Using PH2 screwdriver, begin to loose the four screws of the protective metal mounting (highlighted in green boxes).
- [* black] Using PH1 screwdriver, continue to loose the rest of the twenty screws that fix the PCB to the metal-casing.
+ [* black] Using PH#2 screwdriver, begin to loose the four screws of the protective metal mounting (highlighted in green boxes).
+ [* black] Using PH#1 screwdriver, continue to loose the rest of the twenty screws that fix the PCB to the metal-casing.